What will it cost to build?

Grey structure plus finishing, by quality tier - then get an exact quote from our team.

Covered area
1,913 sq ft

Grey structure (2100/sqft)PKR 4,016,250
Finishing (3200/sqft)PKR 6,120,000

Construction totalPKR 10,136,250

Build cost only — excludes land, boundary & development. Indicative 2026 estimate; final cost depends on design and finishes.

Get exact figures from our team on WhatsApp
Basis of estimateDue diligence · 2026
How the area is derived
  1. Plot: 5 Marla = 1,125 sq ft (1 Marla = 225 sq ft)
  2. Coverage: 85% of plot per floor
  3. Floors: G + 1 (2 levels)
  4. Covered area = 1,913 sq ft
Applied rates (PKR / sq ft)
Grey structure 2,100 · Finishing 3,200
Named material specification
  • Cement (OPC, 50kg bag)PKR 1,350/bag
  • Steel Grade 60 (Amreli/Mughal/Ittehad)PKR 285/kg
  • Bricks (Awwal quality)PKR 22,000/per 1000
  • Sand (Ravi/Chenab)PKR 45/cu ft
  • Crush / Bajri (Sargodha)PKR 80/cu ft
  • Grey-structure labourPKR 400/sq ft
  • Tiles (standard)PKR 280/sq ft
Full material spec →

Scope: construction on your own plot — excludes land, boundary wall & development. Estimated on the Al Ammana named material specification at current Twin‑Cities rates (2026), and cross‑checked against our published fixed‑price packages. For a guaranteed all‑in turnkey price (land + build + finish), see our packages.